Project and Success Story

Demineralization Water Plant
System Built-up: 5000 Points
Duration: 2014 Q4 – 2015 Q3
•A fertilizer facility located at Palembang Indonesia
​
•System design & development:
Water Treatment
​
•Design process system such as clarifier process, pressure sand filter process, active carbon filter process, reverse osmosis process and mixed bed process
​
•Allow end-users to enhance the efficiency of fertilizer production

Pneumatic Refuse Collection System
System Built-up: 2000 Points
Duration: 2015 Q2 – 2017 Q2
•Integrated mixed-use development located at the heart of Singapore’s vibrant new central business district
•System design & development:
Pneumatic Refuse Collection System (PRCS)
•A type of waste disposal system that uses air to move refuses to designed collection points through pipes
•Optimization of manpower for waste collection through a fully automated system

Data Centre
System Built-up: 10000 Points
Duration: 2015 Q2 – 2017 Q3
•Located at Kim Chuan, Singapore
​
•System design & development:
Data Centre Infrastructure Management (DCIM)
​
•Monitoring equipment such as CRAC, FCU, UPS, iPDU, Inline-meter, Water Leak Detecting System & etc.
•Different access level to limit different user access on the system

Data Centre
System Built-up: 130000 Points
Duration: 2017 Q3 – 2018 Q4
•Located at Woodlands, Singapore
​
•System design & development:
Building Management System (BMS)
Electrical Power Monitoring System (EPMS)
​
•Design control sequence of chiller plants, ACMV equipment (e.g. AHU, FCU, PAU, fans, dampers) and purging system
​
•Monitor equipment status, report generation, and assigned access level for different users

Data Centre
System Built-up: 30000 Points
Duration: 2015 Q2 – 2017 Q3
•Located at Sunview Drive, Singapore
​
•System design & development:
Data Centre Infrastructure Management (DCIM)
​
•Monitoring equipment such as DRUPS, GENSET, HVSB, LVSB, CRAC, FCU, Chiller & etc.
​
•Allow customer to generate report, e.g. Greenmark report

Biomedical
System Built-up: 5000 Points
Duration: 2018 Q1 – 2019 Q2
•A laboratory facility located in Singapore which serving 16 countries in the Asia Pacific region
​
•System design & development:
AHU control system
​
•Design AHU control system and monitoring clean room condition via various sensor

Public Utilities Board (PUB)
System Built-up: 6000 Points
Duration: 2016 Q4 – 2021 Q3
•Singapore’s first and largest waterworks that meet WHO standard, located at Chestnut Avenue
•System design & development:
Waste Water Treatment
•Design control sequence of Bio-activated Carbon (BAC) system
•Monitor water treatment equipment such as backwash pump, air scour blower, filter & etc.